Fernwood timelapse August 28 – Posted in: Updates Fernwood Second floor Buildsmart floor band installed http://localimpactdesign.ca/wp-content/uploads/2018/01/Fernwood_2017Aug28.mp4 Author:Joan Joseph Contractor:Above Board Carpentry Second floor Buildsmart floor band installed Installing the Buildsmart floor band 00:58 August 28, 2017 Twitter LinkedIn