September 5, 2017
– Posted in:
Updates
This series of timelapse videos documents Above Board Carpentry as they install the Buildsmart prefabricated wall system on the construction site of Jim & Joan Josephs residence near Minden Ontario.
August 30, 2017
– Posted in:
Updates
Concrete under the garage gets poured
August 29, 2017
– Posted in:
Updates
Second floor Buildsmart walls go up.
August 28, 2017
– Posted in:
Updates
Second floor Buildsmart floor band installed
August 18, 2017
– Posted in:
Updates
Subfloor installed on second floor.