Second floor Buildsmart floor band installed
Design
Fernwood timelapse August 18
August 18, 2017 – Posted in: UpdatesSubfloor installed on second floor.
Fernwood timelapse August 16
August 16, 2017 – Posted in: UpdatesTimelapse of Passive House build at Minden Ontario using Buildsmart pre-fab panel system on a monolithic slab. Subfloor prep. Day 3
Fernwood timelapse August 14
August 14, 2017 – Posted in: UpdatesTimelapse of Passive House build at Minden Ontario using Buildsmart pre-fab panel system on a monolithic slab. First-day installing first-floor wall assemblies.